R. B. Somerville Company Ltd. 
Corporate Office



Located in Rocky View, Alberta, this 4,160 sq. ft. office was executed under a design build contract. Interior has an epoxy floor with skylights for daylighting to create a comfortable work space. Project was fast tracked to meet clients 4 month timeline. Project was completed in spring of 2016.


Ground-side Service Equipment
YYC Calgary Airport Authority


Located at the Calgary International Airport in Calgary, Alberta, this 50,000 sq. ft. building was constructed to house air side equipment. Project was executed under a design build. The interior slab and approach are able to withstand 750KN point loads and the building has daylighting solutions provided by skylights. Project was fast tracked and completed in July of 2016 after 8 months of construction.


fEATURE PROJECT - Municipal

SPY HILL CONCRETE PLANT
Equipment Housing Structure


Located in Calgary, Alberta, this 8,750 sq. ft. facility was constructed over an existing concrete patch plant. Roof system was designed to accommodate the silo penetrations. Project was executed while all equipment remained in place. Project was completed in 2013.


fEATURE PROJECT - iNDUSTRIAL

fEATURE PROJECT - cOMMERCIAL

Airside Maintenance Centre
Maintenance Office / Warehouse



Located in Calgary, Alberta, this 42,000 sq. ft. office/warehouse was constructed to maintain airside equipment. Project is unique in its structural requirements. Building required a 10 ton and a 15 ton crane running transverse with open concept interior. Structure had to look minimal while being supject to large forces. Project completed in July 2015.


FeATURED pROJECT