R. B. Somerville Company Ltd. 
Corporate Office



Located in Rocky View, Alberta, this 4,160 sq. ft. office was executed under a design build contract. Interior has an epoxy floor with skylights for daylighting to create a comfortable work space. Project was fast tracked to meet clients 4 month timeline. Project was completed in spring of 2016.


Ground-side Service Equipment
YYC Calgary Airport Authority


Located at the Calgary International Airport in Calgary, Alberta, this 50,000 sq. ft. building was constructed to house air side equipment. Project was executed under a design build. The interior slab and approach are able to withstand 750KN point loads and the building has daylighting solutions provided by skylights. Project was fast tracked and completed in July of 2016 after 8 months of construction.


fEATURE PROJECT - Municipal

Spy Hill Concrete Plant
Equipment Housing Structure


Located in Calgary, Alberta, this 8,750 sq. ft. facility was constructed over an existing concrete patch plant. Roof system was designed to accommodate the silo penetrations. Project was executed while all equipment remained in place. Project was completed in 2013.


fEATURE PROJECT - iNDUSTRIAL

fEATURE PROJECT - cOMMERCIAL

Glacier Village Business Park
Office / Warehouse Condominium


Completed in November of 2017, the Glacier Village Business Park was conceptualized and built by SBL Contractors to offer an attractive professional destination in the Great Plains Industrial Area of Southeast Calgary.  This building was architecturally upgraded to include insulated Falk exterior panels, a stacked stone facade, and a modern colour scheme.  Although originally designed as a cohesive 12 unit commercial condominium, the southern corner of the building was customized to suit a future tenant with the inclusion of loading docks and a fully drive through yard.  A sister project is scheduled for completion in 2018.


FeATURED pROJECT